
The success story of Habib Makina and GBC on the construction of the Çanakkale Bridge. 128,000 tonnes of steel were processed. Cold bevelling was carried out on the steel plates using a GBC MULTIEDGE machine.

The success story of Habib Makina and GBC on the construction of the Çanakkale Bridge. 128,000 tonnes of steel were processed. Cold bevelling was carried out on the steel plates using a GBC MULTIEDGE machine.