
The success story of Habib Makina and GBC on the construction of the Çanakkale Bridge. 128,000 tonnes of steel were processed. Cold bevelling was carried out on the steel plates using a GBC MULTIEDGE machine.

The success story of Habib Makina and GBC on the construction of the Çanakkale Bridge. 128,000 tonnes of steel were processed. Cold bevelling was carried out on the steel plates using a GBC MULTIEDGE machine.
This site uses cookies to deliver its content, measure how the site performs and understand how visitors use it. Strictly necessary cookies are required for the site to work and are always used; measurement and advertising measurement cookies run only if you allow them. For details see Cookie Notice.